Spokane, WA

Wilson Elementary School Classroom Addition

Markets
Services
Features
SEPA
Water and Fire Calculations
GC/CM
Designing site improvements to support Wilson Elementary’s new 9,300 SF classroom wing

AHBL provided civil engineering and landscape architecture for Spokane Public Schools’ Wilson Elementary School Classroom Addition project, in connection with the design and construction of new classrooms and site improvements. The $2.8M project included a 9,300 SF addition on the existing Wilson Elementary School property. 


AHBL provided civil design development and construction documents for required permitting including SEPA, SMSM, onsite water and fire calculations, sanitary sewer main extension, horizontal control and paving plans, and CSI specification, along with GC/CM coordination, value engineering, early site package construction documentation, conformed construction documents, construction phase services, and record drawings. AHBL’s landscape architecture services included site development research, site planning assistance, design elements narrative, concept grading, and stormwater discharge planning.

 

 

Teaming Partner:

  • Architecture: Integrus Architecture, P.S.

Related Projects

  • Key Peninsula Middle School Improvements

    Voter-approved bond funded upgrades to increase capacity and improve access

  • Fife Elementary School

    Features outdoor learning classroom with vegetable garden

  • Bezos Academy and Discovery Children’s Museum

    Children’s campus combines education, play, and biophilic architectural design

  • Mt Stuart Elementary School

    Replacement school constructed on the existing site with minimal disruption to the academic calendar

  • Annie Wright Schools Nature Play Area

    The team sought to create an imaginative, hands-on learning environment to inspire children to explore, discover, and play