Spokane, WA

West Plains Logistics

Markets
Services
Features
Concrete Tilt-Up
EV Infrastructure
Sustainability
SEPA
80 Loading Docks
Integrating EV‑ready infrastructure and sustainable materials into a modern distribution facility

AHBL provided civil engineering, landscape architecture, and land surveying services for a 278,000 SF distribution center in Spokane, WA. This single-story concrete tilt-up building features 80 loading docks, 500 parking stalls, 360 truck stalls, EV infrastructure for future chargers, and Type 1L cement for sustainability. AHBL’s team developed designs for multiple site options, including grading, drainage, utility plans, and SEPA documentation. AHBL also prepared roadway plans to support the widening of S Hayford Rd along the project frontage. Landscape architects prepared planting plans, cost estimates, and supported permitting and construction. Land surveyors completed boundary, topographic, and ALTA surveys for the 45-acre site. During construction, AHBL worked closely with Perlo and the Developer to address sub-contractor questions and multiple design modifications that arose due to constraints from unknown existing conditions.

 

 

Photography: Skytech Aerial

Teaming Partners:

  • Developer: Panattoni and Nelson Worldwide
  • Contractor: Perlo Construction

Related Projects

  • Gray GEG5 Warehouse

    278K SF distribution center with 80 docks, 500 stalls, EV-ready built with sustainability in mind

  • Simplot Moses Lake

    Land surveying services for sustainable food processing facility in Moses Lake

  • Bridge Point I-5 Seattle

    Gravel pit converted to industrial park in Milton

  • DSE8 Bremerton Delivery Station

    Delivery station in Port of Bremerton supporting development goals for Puget Sound industrial center

  • Track 6 Warehouse

    Unique multi-level industrial warehouse with heavy floor loading and industrial elevators