Spanaway, WA

Sprinker Outdoor Recreation Center Improvements

Markets
Services
Features
Active Construction
Community Area
Restrooms
Site Infrastructure
Site Integration
Stormwater Plan
Landscape design blends the facility seamlessly into surrounding park space

As part of an on-call services contract with Pierce County Parks and Recreation, AHBL provided civil engineering and landscape architecture services for the addition of a new restroom facility at the Sprinker Recreation Center in Spanaway. The project site, located adjacent to the Parkland Community Trail, required careful coordination with existing infrastructure and ongoing construction activities. AHBL’s scope included site grading, stormwater management, utility connections (sewer, water, and power), and pedestrian paving around the new facility. The team prepared an abbreviated stormwater plan in accordance with the 2021 Pierce County Stormwater Manual and coordinated with Pierce County Utilities for sewer pretreatment requirements. Landscape architecture services focused on integrating the restroom into the existing park setting with accessible paving and site furnishings.

 

Teaming Partners

  • Owner: Pierce County Parks and Recreation

Related Projects

  • 132nd Square Park

    A stormwater park comes to life in Kirkland

  • Beacon Hill Trailheads

    Enhancing access to the Beacon Hill recreation area

  • Oak Tree Park Improvements

    Oak Tree Park contains 25-acres of historic Garry Oak habitat

  • Sprinker Outdoor Recreation Center Improvements

    Landscape design blends the facility seamlessly into surrounding park space

  • Finch Arboretum Master Plan

    Bringing stakeholders and community together to reimagine a beloved park