Spokane, WA
Carla Peperzak Middle School
AHBL provided civil engineering services for Spokane Public Schools’ South Middle School project. The new school is located in Spokane’s South Hill neighborhood and is home to up to 875 students. The 150,000 SF building was designed to emphasize the surrounding Palouse landscape and encourage learning. The project was broken into two phases. During the Phase I, AHBL civil engineers prepared storm drainage, grading, and utility plans based on site plan and assisted on stormwater layout and sizing. During Phase II, AHBL’s civil engineers provided services for additional utilities, road improvements for site access, final site grading and surfacing, playfield construction, and demolition of the existing school. The new school was delivered via General Contractor/Construction Manager (GCCM) for a maximum allowable construction cost (MACC) of $48M and officially named Carla Peperzak Middle School, after the holocaust survivor and Dutch resistance fighter that now resides in Spokane.
Photos: Edison Creative Group
Teaming Partners
- Owner: Spokane Public Schools
- Architect: Integrus Architecture
- Contractor: Garco Construction