New entry location eases congestion and provides safer access

Formerly situated between Interstate 5 and American Lake, this project relocated the main gate access to Camp Murray to the intersection of Portland Avenue and Boundary Road. The Washington Military Department entrusted a team, including AHBL, to design approximately 4,000 LF of new roadway, a guard shack, a security station, and a gate canopy.

AHBL’s roadway design complies with Pierce County Emergency Vehicle Access requirements. Roads are sloped to one side to allow stormwater runoff to sheet flow from the paved surface into adjacent bioretention swales. Asphalt wedge curbs were also designed in sensitive areas to convey runoff from pollution-generating surfaces outside of critical area buffers for treatment.

 

Teaming Partners

  • Owner: Washington State Military Department
  • Architect: KMB Architects

Related Projects

  • Benton Rural Electric Association Campus

    Phased development to minimize delays and costs

  • Unity Bridge

    Award winning bridge links two previously unconnected sides of JBLM to help improve traffic for service members and civilians.

  • Spokane Valley Library

    A natural ecosystem designed to evolve over time

  • Pasco Fire Station 85

    Landscape design focused on sustainability

  • Lakehaven Utility District Headquarters

    All AHBL services were used in this beautiful new three-story, 37,000 SF administration building for Lakehaven Utility District