Spokane, WA

Gray GEG5 Warehouse

Markets
Services
Features
80 Loading Docks
360 Truck Stalls
Concrete Tilt-Up
Drainage Design
EV Infrastructure
Grading and Utility Plans
Permitting and Construction Support
Planting Plans
Roadway Improvements
SEPA Documentation
278K SF distribution center with 80 docks, 500 stalls, EV-ready built with sustainability in mind

AHBL provided civil engineering, landscape architecture, and land surveying services for a 278,000 SF concrete tilt-up distribution center in Spokane, WA. The facility includes 80 loading docks, 500 parking stalls, 360 truck stalls, EV infrastructure for future chargers, and incorporates Type 1L cement for sustainability. AHBL developed multiple site layout options, grading and utility plans, drainage design, and SEPA documentation, as well as roadway improvements for the widening of S Hayford Rd. Landscape architects prepared planting plans, cost estimates, and supported permitting and construction. Land surveyors completed boundary, topographic, and ALTA surveys. During construction, AHBL assisted in the resolution of subcontractor questions and adapted designs to unforeseen site conditions.

 

Photos: SkyTech Aerial

Teaming Partners

  • Owner: Panattoni Development Company
  • Architect: Ford and Associates Architects
  • Contractor: Perlo Construction

Related Projects

  • SeaPort Logistics Center

    Integrated engineering for a large‑scale industrial logistics campus

  • Post Falls Truss Company, Posts Falls, ID

    Post Falls Truss Company

    A Coordinated Approach to Industrial Site Development

  • Garland Warehouse

    Multidisciplinary design and survey support for a 70‑acre distribution campus

  • Panattoni Big Freddy Industrial

    Multidisciplinary design for a major industrial logistics campus

  • Logistics Property Building 5

    Engineering a high‑volume logistics facility through smart structural optimization