Tacoma, WA

Skyline Elementary School

Markets
Services
Features
Civil design for site demolition and utilities
Grading, paving, and storm drainage plans
Phased construction
50,000 SF
On‑time, on‑budget project delivery
Civil design solutions shape the new Skyline Elementary School

AHBL provided civil engineering services for the new 50,000 SF school. Our team prepared a site and utility demolition plan, storm drainage plan, and plans for paving, grading, and utilities. The project was designed to keep Skyline Elementary School open throughout construction, adding an extra layer of complexity. However, our team, familiar with phased construction, rose to the occasion and delivered outstanding results. The school building was completed on time and within budget, providing students with a beautiful and functional learning space.

 

Photos: BCE Engineers

Teaming Partners

  • Owner: Tacoma Public Schools
  • Architect: SRG Partnership

Related Projects

  • Boze Elementary School

    The first progressive design-build K-12 project in Washington state

  • Fife Elementary School

    Features outdoor learning classroom with vegetable garden

  • Mt Stuart Elementary School

    Replacement school constructed on the existing site with minimal disruption to the academic calendar

  • Bryant Montessori Elementary School

    Transforming a legacy school into a future‑ready learning environment

  • Fawcett Elementary School

    Replacement of the 72-year-old Fawcett Elementary School through a progressive design-build approach