Spokane, WA

Gray GEG5 Warehouse

Markets
Services
Features
80 Loading Docks
360 Truck Stalls
Concrete Tilt-Up
Drainage Design
EV Infrastructure
Grading and Utility Plans
Permitting and Construction Support
Planting Plans
Roadway Improvements
SEPA Documentation
278K SF distribution center with 80 docks, 500 stalls, EV-ready built with sustainability in mind

AHBL provided civil engineering, landscape architecture, and land surveying services for a 278,000 SF concrete tilt-up distribution center in Spokane, WA. The facility includes 80 loading docks, 500 parking stalls, 360 truck stalls, EV infrastructure for future chargers, and incorporates Type 1L cement for sustainability. AHBL developed multiple site layout options, grading and utility plans, drainage design, and SEPA documentation, as well as roadway improvements for the widening of S Hayford Rd. Landscape architects prepared planting plans, cost estimates, and supported permitting and construction. Land surveyors completed boundary, topographic, and ALTA surveys. During construction, AHBL assisted in the resolution of subcontractor questions and adapted designs to unforeseen site conditions.

 

Photos: SkyTech Aerial

Teaming Partners

  • Owner: Panattoni Development Company
  • Architect: Ford and Associates Architects
  • Contractor: Perlo Construction

Related Projects

  • Vancouver Logistics II

    339,00 SF warehouse supports industrial growth with integrated design solutions

  • PAE2 Arlington

    Washington's largest distribution center at five-stories and 100-feet-tall

  • Track 6 Warehouse

    Unique multi-level industrial warehouse with heavy floor loading and industrial elevators

  • CenterPoint Logistics

    Delivering high‑performance structural design for a complex industrial site

  • East Main Puyallup Logistics

    Award-winning project driving economic growth