Auburn, WA
Pioneer Elementary School, Auburn School District
AHBL provided civil engineering and land survey services for the 77,000 SF Pioneer Elementary School. Civil scope included roadway frontage improvements; storm drainage flow control and water quality improvements; water main replacements; new ADA ramps; and roadway signage and channelization plans in accordance with City of Auburn standards.
Site development included earthwork, grading, paving, water, sewer and storm (including an underground detention for flow control and stormwater quality). Half street road improvements were performed on all three roads bordering the site including one drive lane, parking, bike lane, concrete curb, gutter, sidewalk, and planting strip. Prior to the construction of the replacement elementary school, AHBL conducted boundary and topographic surveys of the property for the Auburn School District. AHBL’s scope of work included a topographic survey of the elementary school campus and adjoining roadways, totaling approximately 14.9 acres. The survey located utilities, buildings, finish floor elevations, asphalt, concrete, curbing, ditches, drives, guardrails, tops and toes of slopes, trees, fences, and all other improvements within the survey area. This survey effort also included the full width of M Street SE, K Street SE, and 25th Street SE. AHBL prepared a topographic survey base map that accurately depicts parcel boundaries, current zoning, easements affecting subject property, physical improvements, and existing ground contours.
Photos: Doug Walker
Teaming Partners
- Owner: Auburn School District
- Architect: NAC Architecture